| Vessel penetration and support interface | Identify the roof or cover opening, mounting structure, reinforcement, imposed reactions, headroom and controlled vessel drawing. | Identify the shell opening, elevation, orientation, attachment, local loads, external envelope and controlled vessel drawing. | Identify the bottom opening, local geometry, attachment, loads, relationship to supports and controlled vessel drawing. |
|---|
| Working levels and impeller position | Record shaft and impeller locations at minimum, normal and maximum working states plus clearance to every internal feature. | Record the entry elevation, proposed impeller path, liquid-level relationship, off-centre geometry and nearby internals for every relevant state. | Record the impeller and shaft relationship to the tank bottom, outlet, heel, internals and each relevant working state. |
|---|
| Process motion and endpoint evidence | Require candidate-specific evidence for the declared duty without assuming that a vertical shaft proves full-batch circulation or result. | Require candidate-specific evidence for the declared duty without assuming that a horizontal entry proves bulk circulation, suspension or homogeneity. | Require candidate-specific evidence for the declared duty without assuming that bottom entry proves turnover, shear, dispersion or product quality. |
|---|
| Drive, shaft, bearing and vessel loads | Keep torque, speed, shaft length, bearings, support, critical mechanical checks and roof reactions attached to the exact arrangement. | Keep torque, speed, overhung and other shaft loads, bearings, support, seal and shell reactions attached to the exact arrangement. | Keep torque, speed, shaft and bearing arrangement, seal, bottom reactions and support interactions attached to the exact arrangement. |
|---|
| Seal, containment and leak consequence | Define product and cleaning exposure, pressure state, support fluids, drains and the credible path of leakage at the upper entry. | Define exposure, static head and pressure states, isolation, support fluids, drains and the credible path of leakage at the shell entry. | Define exposure, static head and pressure states, isolation, support fluids, drains and the credible path of leakage at the bottom entry. |
|---|
| Access, lifting and removal route | Show headroom, platform, guarding, lifting points and the controlled route for drive, seal and shaft access or removal. | Show perimeter access, isolation boundary, external clearance, lifting and the controlled route for drive, seal and shaft work. | Show under-vessel or floor access, lifting, isolation, support interference and the controlled route for drive, seal and shaft work. |
|---|
| Drainage, recovery and cleaning boundary | Map residue, shaft and impeller access, internal support if proposed, cleaning chemistry, inspection and release evidence. | Map residue around the shell entry, impeller and internal interfaces plus isolation, cleaning, inspection and release evidence. | Map the relationship to the outlet and heel, external bottom assembly, cleaning path, inspection and release evidence. |
|---|
| Project evidence and final release | Approve the exact proposal, drawings, calculations, responsibility matrix and applicable test evidence; do not release from the category name. | Approve the exact proposal, drawings, calculations, responsibility matrix and applicable test evidence; do not release from the category name. | Approve the exact proposal, drawings, calculations, responsibility matrix and applicable test evidence; do not release from the category name. |
|---|