| Original rate label and unit | Copy the source value, unit, label, document revision and nearby notes without renaming flow as throughput or capacity. | Preserve the second source in the same way; keep volume per time and mass per time distinct unless a controlled density basis and state are supplied. | Original quotation fields, unit definitions, material state, density source if a conversion is proposed, data owner and unresolved ambiguity. |
|---|
| Material path and rate identity | Mark pump or loop circulation, fresh single-pass feed, mill discharge, accepted downstream output, batch average, shift average or campaign average. | Map the second proposal independently; do not treat repeated loop crossings as newly produced material or assume an outlet field is accepted product. | Process-flow sketch, tank and mill boundaries, return path, transfer points, measurement location and one approved name for every rate field. |
|---|
| Feed, configuration and operating mode | Attach product and lot, composition, solids or concentration basis, rheology, temperature, feed state, mill, media, separator and pass or loop history. | Record the same fields for the second proposal and disclose every difference instead of importing a rate from another material or configuration. | Configuration-controlled test record and the separate operating-mode decision that applies to the quoted rate. |
|---|
| Endpoint and accepted disposition | State sample point and time, preparation, test method, instrument or gauge basis, acceptance rule and whether the quantity passed, waited, reworked or was rejected. | Use the same endpoint and disposition vocabulary or show why its output cannot be compared directly. | Matched release method, identified samples, result record, accepted quantity, rework or rejection quantity and responsible approver. |
|---|
| Elapsed-time boundary | Define clock start and stop, then list charging, priming, ramp-up, milling, sampling, holds, downtime, drain, cleaning and changeover as included or excluded. | Apply the same time ledger to the second proposal; do not compare a run-only rate with a shift or campaign average without preserving both records. | Time-stamped event log, included productive interval, excluded interval with reason, planned operating window and comparison basis. |
|---|
| Material balance and accepted yield | Record charged material, additions, samples, retained hold-up or heel, normal recovery, gross discharge, off-spec, rework, cleaning loss and accepted output. | Reconcile the second proposal with the same categories; do not infer accepted yield from pump flow or gross discharge alone. | Quantity source and uncertainty for every balance row, accepted disposition, unexplained difference and owner for closure. |
|---|
| Production window and confirmation | Identify whether the claim belongs to a test interval, one batch, repeated batches, a shift or a campaign, plus staffing, upstream and downstream constraints. | Identify its window and constraints separately; keep model- or application-specific source results attached to their original evidence. | Representative confirmation plan, supplier review, uptime and changeover assumptions, acceptance owner, exclusions and change triggers. |
|---|